Rock drilling and bolting

Rock drilling and bolting

Rock drilling and bolting are bedrock construction techniques used to ensure the stability and safety of structures. Rock drilling is an essential phase in many construction projects. It is especially necessary in situations where the bedrock significantly affects the construction process or is used as a foundation for a building. It is often used on bridge and tunnel construction sites, for example.

Read more about rock drilling: Rock drilling

Rock bolting is used to strengthen the bedrock. There are different types of bolts available, and the bolt type is always chosen in accordance with the site-specific properties. Bolts or anchors are drilled into the rock to support the structures being built. Bolting prevents cave-ins and strengthens structures. Reinforcement bolting is especially suitable for tunnels and open cuttings to support the bedrock, while anchor bolting is mostly used for ensuring the stability of buildings

Read more about bolting: Rock bolting

JIITEE has the equipment and expertise needed for rock drilling and bolting on any site, no matter how demanding. With our specialized equipment, we can work at a height and in confined spaces. You can always rest assured that JIITEE will deliver high-quality results that ensure the safety of your structures. 

Whatever your needs, we’re here to help! We have extensive experience in bedrock construction, where rock drilling and bolting are a crucial part of ensuring the stability and safety of structures. 

Bolting and drilling we have made

  • Raidejokeri, Patterinmäki tunnel – YIT 2020 – Drilling-bolting, shotcrete
  • Renovation of the Pepallonmäki train tunnel, R. Ajalin 2019–2020 – Drilling-bolting, shotcrete, networking.
  • Kemi mine, Skanska 2019–2020 – Reinforcement bolting approx. 200 000 jm, shaft reinforcement works
  • Rock cavern thermal energy storage of Helen Mustikkamaa – YPR 2019 – strengthening works, e.g., drilling-bolting, shotcrete drainage systems, and shotcreting
  • Reinforcement works for the capsule shaft of the final disposal facility, Posiva/Olkiluoto 2019 – drilling-bolting, grouting, and cladding installation.
  • Kittilä mine Agnico Eagle, 2019 – Mine reinforcement and rock construction work, e.g., drilling-bolting, networking, anchoring for structures
  • T2 Terminal Helsinki-Vantaa – Kreate Oy 2019–2020 – cement injection, drilling-bolting, shotcrete drainage system, and shotcrete
  • Renovation of wastewater treatment plant Henriksdal, Stockholm, YIT Sverige AB 2018 – Renovation of wastewater treatment halls, strengthening of roof structures, drilling and bolting 28 000 rm, rock net installation approx. 20 000 m2
  • Blominmäki wastewater treatment plant, Espoo – YIT Infra Oy 2018 – Reinforcement bolting approx. 400,000 rm and equipment works, anchoring for structures drilling and bolting approx. 25 000 jm
  • Renovation of the train tunnel, Lavianmäki – Destia Rail Oy 2018 – Renovation of the Rantarata train tunnel 580 m, drilling and welding of 11,500 pins, networking 11 500 m2, shotcrete 1 230 m3
  • Länsimetro Kivenlahti, Espoo, Kalliorakennus-Yhtiöt Oy – drilling and soldering of 15 000 threaded pins
  • Länsimetro Soukka, Espoo, Kalliorakennus-Yhtiöt Oy 2018 – drilling and soldering of 10 000 threaded pins
  • Länsimetro Sammalvuori metro depot, Espoo – Aro Systems Oy, Kalliorakennus-Yhtiöt Oy, Forssan Asentajat Oy 2018 – Reinforcement work on shafts 2 pcs., drilling and soldering of structural joints approx. 14 500 pcs.