Excavation and reinforcement work in sewer tunnels as part of several contracts in the capital area
Renovation of a civil defense shelter in a densely built residential area
Sewer tunnel excavation in central Helsinki
Constructions of a solar farm in Kalanti
Nordkalk Oy, Parainen mine
Posiva waste facility’s capsule shaft
Agnico Eagle Finland
Suvic Oy
Excavation and reinforcement work in sewer tunnels as part of several contracts in the capital area
JIITEE Työt has carried out several contracts for sewer tunnels built by Helsinki Region Environmental Services Authority (HSY).
Renovation of a civil defense shelter in a densely built residential area
JIITEE Työt was responsible for the renovation of a civil defense shelter in a residential area on a turnkey...
Sewer tunnel excavation in central Helsinki
JIITEE Työt carried out the comprehensive excavation and rock reinforcement work of a significant site in terms of functional...
Constructions of a solar farm in Kalanti
Jiitee Työt participates in the construction of a solar farm in Kalanti, one of the largest in Finland. The...
Nordkalk Oy, Parainen mine
The Parainten mine, owned by Nordkalk Oy, excavates limestone in an open-pit. JIITEE Työt excavated and reinforced a 340-meter...
Posiva waste facility’s capsule shaft
In Finland, the final disposal of nuclear waste refers to the final disposal in crystalline bedrock, which most of...
Agnico Eagle Finland
Kittilä is home to Europe’s largest gold mine with an annual production of approximately 7,000 kilos of gold. JIITEE...
Suvic Oy
Wind turbines and their demand are constantly growing, and to build wind turbines at all, the foundation work must...